Disassembly of Kamenicka Parking Lot Commissioned – Beginning of Construction of Tunnel Announced for End-May
Source: eKapija
Tuesday, 09.04.2024.
13:36


(Photo: srbija2027.gov.rs)

The tender envisages the disassembly and transport of the disassembled elements to the International Terminal Block 43.
The total area of the fast-park structure to be disassembled is 990 m2.
The tender is open until April 23, and more details (in Serbian) can be found HERE.
The disassembly of this parking lot, all things considered, amounts to preparatory works ahead of the beginning of the long-since-announced construction of the tunnel whose entrance portal will be located precisely in the zone of Kamenicka Street, and which will exit to Palilula in Despota Stefana Blvd.
For a long time now, there have been speculations about when the more concrete works on this tunnel might begin, and according to the most recent announcement made by the head city urban planner, Marko Stojcic, yesterday, as the Blic daily reports, they should start at the end of May. As Stojcic pointed out, they will begin in Despota Stefana Blvd.
– The tunnel is around two kilometers long and its role is to direct the traffic from New Belgrade, which goes toward Palilula, Zvezdara and the bridges on the Danube, underground, so that there is no transit traffic in the city center, so the traffic will be unloaded by one fifth there – Stojcic assures.
Let us remind that, around a month ago, the president of the Temporary Organ of the City of Belgrade, Aleksandar Sapic, said that the first works on the tunnel from Karadjerdjova Street near the Faculty of Economics to the Despota Stefana Blvd, announced for decades, would start at the end of April or at the beginning of May. Sapic emphasized at the time that “we have succeeded in shortening the methodology of the construction of that tunnel,” but didn’t explain what it meant exactly or what it entailed.
Lokacija:
Google Maps
Companies:

Tags:
PUE Parking Service Belgrade
parking lot fast park Kamenička
International Terminal Block 43
Marko Stojčić
Aleksandar Šapić
tunnel from Karađorđeva Street to Despota Stefana Blvd
Comments
Your comment
Naš izbor
Most Important News
Full information is available only to commercial users-subscribers and it is necessary to log in.
Follow the news, tenders, grants, legal regulations and reports on our portal.
Registracija na eKapiji vam omogućava pristup potpunim informacijama i dnevnom biltenu
Naš dnevni ekonomski bilten će stizati na vašu mejl adresu krajem svakog radnog dana. Bilteni su personalizovani prema interesovanjima svakog korisnika zasebno,
uz konsultacije sa našim ekspertima.